TELKOM NIKA Indonesia n  Journal of  Electrical En gineering   Vol. 12, No. 9, September  2014, pp. 64 7 1  ~ 647 8   DOI: 10.115 9 1 /telkomni ka. v 12i9.635 2          6471     Re cei v ed  Jun e  1, 2014; Re vised July 1 0 , 2014; Accept ed Jul y  26, 2 014   Assessment of Electric Field Distribution Inside  500/220kV Open Distribution Substations during  Working Conditions      Sa y e d A. Ward, Sam y  M.   Ghania, Essam M. Shaalan*  Electrical E ngi neer ing D e p a rtment, F a cult y   of Engin eer ing  at Shoubr a    Benha U n iv ersit y , Cair o, Eg ypt  *Corres p o ndi n g  author, e-ma i l : essam.shih ata@fen g .bu.e d u .eg       A b st r a ct  T he hig h  leve l electric fiel d int ensity pro duce d   by hig h  volta ge (HV) equ ip me nts insid e  5 00/22 0k V   substatio n s is  har mful for the  hu ma n (staff) health.  T her efor e the  min i mu m healt h  an d saf e ty requ ire m e n t regar din g  the e x posur e of w o rkers to the risk arisin g fr om e l ectric fields pr o duce d  insi de th ese substati on s   is still cons id e r ed as a co mpetitive to pic for utilit y d e sig ners, w o rld h ealth or ga ni z a tion (WHO) a n d   bio m edic a l fi el d rese arch ers.  It is very i m port ant to  hav e  kn ow ledg e a b o u levels  distri buti on  of el ectric fi eld   intens ity w i thin these hig h  vo ltage su bstatio n s as ear ly stage i n  the pro c ess of substa tion des ign. T h i s   pap er  prese n ts resu lts of  in vestigati o n  50 H z   e l ectr ic fi el d i n tensity  dist ributi on  ins i de   500/2 20kV  p o w er   transmissio n  s ubstatio n s in  C a iro, Egy p t. T h is pap er pr es en ts a meth od for  assess ment th e distrib u tio n  o f   50HZ   e l ectric field intens ity distrib u tion insi de  this  s ubsta tion, this  meth od of a n a l ysis  is bas ed  on t h e   charg e  simul a tion tech niq ue ( C SM). This study w ill se rve  for plan nin g  se rvice w o rks or  for inspecti on  of  equ ip me nt on  HV pow er tran smiss i on s ubst a tions.     Ke y w ords :  ch arge si mulati on  techniq ue, el e c tric  field inte n s ity, high volta ge substati ons     Copy right  ©  2014 In stitu t e o f  Ad van ced  En g i n eerin g and  Scien ce. All  rig h t s reser ve d .       1. Introduc tion   Powerful electric systems  with very  high voltage  are the  source of  harmful  electromagnetic  field radiation. This is because  these electromagnetic field radiations represent  the primary source to the resultant electric al current induced in the human body under or near  electric  power systems [1].  Therefore, the problem  of  the human exposure  to electric fields has  become more important with increasing the  number and the size of power substations  and  electric  power systems in general. This harmf ul attract an increased attention of many  biomedical field researchers, scientific research  communities worldwide on the health effects  of  electric power systems. As a result of this inte rest, the governments are playing an active role  in  the reduction of these exposures to  electric fields by setting expos ure  limits for such fields which  resulting  from different electrical power system s [2-4], to  guarantee the life insurance of all staff  working inside these substations.  The 50Hz electromagnetic field  is dist ributed unevenly  in space between  separate  power installations inside HV substations.  In open 500/220kV power transmission  substations,  the sum  of electromagnetic  field sources  with  grounded  metal constructions  creates a  complex  picture of the electric field. Works are connect ed with operative switchi ng, equipment inspection;  different repair work, etc.  require presence of  staff  personal in various points  of 500kV &  220kV  Switchyards (substation territory). Therefore, the  investigation of the dist ribution levels of  the  electric fields inside these  subs tations is an  important step for  solving  the problem of  personnel  protection from the effects of these fields.  In this paper, the present algorithm  is  carried  out to assessment the distribution levels of  the  electric field intensity produced by differ ent high voltage electrical power systems inside  500/220kV air-insulated  substation (AIS).  In addition  to  the  investigation of  levels distribution  of  electric field intensity inside  500/22kV AIS at  1.5m  from ground surface,  we will also  investigate  the distribution levels of  electric field intensit during different working  conditions and at  different  positions inside this  substation. These calcul ated  levels will  be compared to  the standard  limit  levels stated by international organizations  [2-4]. This developed method is  based  on  the  charge  Evaluation Warning : The document was created with Spire.PDF for Python.
                               ISSN: 23 02-4 046                     TELKOM NI KA  Vol. 12, No. 9, September 20 14:  64 71 – 647 8   6472 simulation technique, which simulate the ty pical 500/220kV substation with all incoming  and  outgoing  feeders by developing multi- scripts  of m-file Matlab software  package to calculate the  distribution levels of electric field  intensity insi de this substation.  This  method is considering  the  complex systems, including three-dimensional  multiple incoming, outgoing overhead lines and  bus system inside this substation.      2.  Substa tion Des c ription and  Sy stem  Modeling   The cal c ul ations of ele c tric fields a r e  perform ed i n sid e  500/22 0kV AIS, Cairo 500   sub s tation. T h is su bstatio n  is suppli ed b y  four  500kV  overhe ad tra n smi ssi on lin es, sin g le ci rcuit,  whi c h are co nne cted to the same 5 00 kV double bu s systems, ma in and stan db y bus-b ars. This  sub s tation  ha s three i denti c al  3-p h , 50 0 M VA, 500/22 0/11kV  po we r tra n sfo r me rs in stalled  in side   it, each  one i s  comp osed  of three  sin g l e  pha se  tran sform e rs. Thi s  sub s tation i s  supplyin g  six  load s thro ugh  six 220 kV do uble-ci rcuit o v erhea tra n s missio n line s  which are o u tgoing from  the  same 2 2 0 k V double bu system s, mai n  and stan db y bus-b ars. This sub s tation has a  si mply  500 kV, 220 kV bus sy ste m with 3 0 0 m  long   an 12m, 9m  hei ght re sp ectiv e ly. Single li ne  diagram for this sub s tation  is pre s ente d  in Figure 1.        Figure 1. Single Line  Diag ram of Simul a ted 500/ 2 2 0 k AIS Substation, Cairo 5 00 Substatio n     Evaluation Warning : The document was created with Spire.PDF for Python.
TELKOM NIKA   ISSN:  2302-4 046     Asse ssm ent of Electric Fi e l d Distri bution  Insi de 50 0/2 2 0kV O pen Distributio n… (Sayed A. Wa rd)  6473 The l o catio n   of equi pment   in the  ope n di stributi o n   sub s tation, a s   usual, is a s ym metrical.  Some eq uip m ent is  often  locate s i n  separat e g r ou ps. Between  these  equi pm ents, the r e a r e a   compl e x syst em of busb a r,  incomin g  an d outgoin g  feeders which are si milar to  the web  cove ring  all ope n di stri bution  sub s ta tion. This co mplicate s  t h e  task of inve stigation the fif t y hertz  ele c tric   field intensity.  The  huma n  b ody is allo cat ed  within th e  highl y expo sure   zone s of electri c   fields  insi de  this su bstatio n  and at different heig h ts t o  determi ne the field dist ribution level s  durin g differe nt   workin g co ndi tions, Figu re  2.          Figure 2. Dif f erent Po sition s of the W o rk ers d u ri ng Dif f erent W o rkin g Con d ition s       Wo rks are conne cted wit h  operat ive switchi ng, equ ipment inspe c tion; differe nt repair  work,  etc.  re quire  p r e s en ce  of  staff pe rso nal  in va ri ous poi n ts of  500 kV &  22 0kV S w itchya rds  (su b statio n te rritory ). Th erefore,  the  inv e stigatio n of  the di stributio n level s  of th e ele c tri c  fiel ds  ins i de these subs tations  is  c a rried out du ring different work ing c o nditions  for  s t aff.  The first Sce nario  is  ca rri ed out at  hei ght of 1.5 m  above th e  gro und l e ve l whi c pre s ent s wo rker  (staff) st andin g  with his foot on grou nd in sid e  swit chyard s duri ng no rmal  operation an d  (hot-stick po sition) d u ri ng  live- wo rki ng  con d ition s  (S cen a rio 1 ) .   The se co nd  Scena rio is  carri ed out at a height  of 11m for 500 kV  switchyard a nd 8.5m  for 220 kV switchyard,  whi c h p r e s ent s the po sition o f  the worke r  (staff) in (ba r e hand p o siti on)  durin g live maintena nce condition s for  500 kV and 2 20kV bu s sy stems (S cena rio 2).  The thi r d S c e nario  is  ca rri ed out  at a h e ight of 1 7 for 50 0kV  switchyard  an 14m fo 220 kV switch yard, whi c pre s ent s the  position  of  the wo rker  (staff) in (ba r e  hand p o sitio n durin g live  maintena nce  con d ition s  for 50 0k an d 220 kV in coming a nd  outgoin g  fee ders   (Sce nari o  3).   In the elect r ic field model p r esented i n  th is pap er, 50 0 k V bu s-b a rs (HV bars) and  220kV   bus-ba r s (LV  bars), in comi ng 500 kV fee ders an out going 2 2 0 k V feeders a r e a pproxim ated  by  internally lo cated line  ch arges. Su ch  simplificat ion  is a c ceptabl e  whe n  the fiel d is a n alyzed  at  a long en oug h distan ce fro m  the con d u c tor, e.g.  near  the gro u nd  surface. The e l ectri c  pote n tial  of incoming 5 00kV feede rs, outgoing 22 0kV feede rsa nd bus-ba r  surfaces ha been defin e d  a s   compl e x pote n tials an d a s sume d to be  equal to thei r phase voltag e.  These a s sumption s lea d  to   a ch arge  sim u lation meth o d  formul ation.   The  stand by bus-ba r s a r rep r e s ente d   by line cha r g e s,  their p o tential  is a s sume to be  zero.  The infl ue nce  of towe r in sul a tors is negl e cted  wh en t he  field is cal c ul ated. In this pape r the HV  system of alternating  cu rrent ar e co nsidere d , theref ore   the potential  and charge d ensitie s are complex qua ntities.  In this pa per  the Ch arg e  S i mulation M e thod i s  u s ed t o  com pute th e ele c tric fiel ds [5],  whe r e the live con d u c tors  are  simulate d  by a num ber of discrete si mulation cha r ges lo cate d o n   Evaluation Warning : The document was created with Spire.PDF for Python.
                               ISSN: 23 02-4 046                     TELKOM NI KA  Vol. 12, No. 9, September 20 14:  64 71 – 647 8   6474 the axis of these con d u c tors. V a lu es o f  si mulation cha r ge s are determi ned b y  satisfying the   boun dary con d itions at a n u mbe r  of cont our  poi nts sel e cted at the  condu ctor su rface s .   Once the val ues  of simul a tion ch arg e are  d e termi n ed, then the  potential a n d  electri c   field of any p o int in the  re gion o u tsid e t he cond ucto rs can be cal c ulated  u s in t he  supe rp osit ion   prin ciple u s in g the followin g  equatio ns:     ] ][ [ ] [ Q P V                                                                                            (1)    Whe r e, [Q] i s  a column  ve ctor  of the fictitious  si mulat i on cha r ge s,  [V] is a colu mn vecto r  of  the   potential giv en by thebo unda ry co ndi tions an d [P ] is the matrix of the Maxwell pote n tial  coef fici ents  which d epe nd  on the type of  fic t itious  s i mulation charges  [5, 6].  In our  develo ped m odel,  we sim u late  HV and  L V  bu s-ba rs, in co mi ng 50 0kV fe e ders a n d   outgoin g  220 kV feeders b y  internally located li ne ch arge s on thei r axes.  There f ore the potentia coef fici ent is  given by [7]:             ( 2 )     Whe r e,   2 1 2 1 2 1 1 ) ( ) ( ) ( Z Z Y Y X X L   2 2 2 2 2 2 2 ) ( ) ( ) ( Z Z Y Y X X L   2 1 2 1 2 1 11 ) ( ) ( ) ( Z Z Y Y X X L   2 2 2 2 2 2 22 ) ( ) ( ) ( Z Z Y Y X X L   2 2 1 2 2 1 2 2 1 ) ( ) ( ) ( Z Z Y Y X X d            ( 3 )     Whe r e,     ) ( 1 ) ( 1 1 2 1 2 1 d L L d L L   ) ( 1 ) ( 1 2 22 11 22 11 d L L d L L     Therefore  the  net field (E i ) at any point  (P i ) d ue to a  numbe r of i ndividual  ch a r ge s (n)  each with cha r ge of (Q j . )  is  given as:           ( 4 )     Whe r e ( F ij ) x , (F ij ) y  and (F ij ) z  are the ‘field i n tensity’ or fi eld co efficien ts and a x , a y  and  a z  are un it  vectors in the  x,  y and z direction s , re sp ectively [7].  The total electric field at the i th  contour p o int is expre s sed a s :     2 2 2 ( zi yi xi i E E E E                         (5)  Evaluation Warning : The document was created with Spire.PDF for Python.
TELKOM NIKA   ISSN:  2302-4 046     Asse ssm ent of Electric Fi e l d Distri bution  Insi de 50 0/2 20kV O pen Distributio n… (Sayed A. Wa rd)  6475 3.  Simulation Results a nd Discussion s   This study was co ndu cted  not only  for  a worke r s st andin g  on the groun d surf ace with   his foot in  switchya rd s d u ring  no rmal  operati on a nd (h ot-stick positio n) d u r ing live - wo rking  con d ition s  (S cen a rio  1), b u t also fo r a  worke r s in li ve line maint enan ce p o siti on (b are  han d   positio n), at a  height of 1 1 m for 50 0kV  swit chyard a nd 8.5m fo r 2 20kV  swit chy a rd  (Sce na rio  2)   and at  a hei g h t of 17m fo r 500 kV switchyard  and  14 m for 2 2 0 k swit chyard (S cen a rio  3).  T he  human b ody  was a s sum ed to be sta nding in free  spa c e and  not in conta c t with elect r ical  grou nd.  W o rkers i n  ba re -hand  wo rki n g  ope rate  very close to live co ndu ctors and they  wear  spe c ial cond u c tive clothing  whi c h protect s  them  agai n s t the exposu r e of the elect r ic field.  The s e   clothe s are ig nore d  in ou r simulation.           Figure 3. Map of the Electric Fiel d (V/m ) Di st ributio n insid e  Cai r o 5 00 Substatio n  during  Scena rio 1       Figure 4.  The  Electric Fi eld  Distrib u tion (V/m)  inside S e lecte d  Subst a tion Switchy a rd du rin g   Scena rio 1       The re se arch  result s whi c h are p r e s en ted in this pa per were ca rried out at the same   actual sche d u le of worki ng conditio n s  for  sele cted sub s tatio n These re sults have b een  pre s ente d  in form of the  electri c  field distri b u tion maps an d su rface di stribu tion (Figure 3 &  0 5 0 100 150 20 0 250 300 0 50 100 150 200 250 300 350 400 -1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 1000 0 1100 0 1200 0 1300 0 1400 0 1500 0 1600 0 1700 0 1800 0 1900 0 2000 0 2100 0 2200 0 Evaluation Warning : The document was created with Spire.PDF for Python.
                               ISSN: 23 02-4 046                     TELKOM NI KA  Vol. 12, No. 9, September 20 14:  64 71 – 647 8   6476 Figure 4).  Th e re sults  of work  are  cu rre n tly us ed fo r orga nization  of the reg u lar works on o p en  distrib u tion substatio n s. Presentation o f  result s in  the form of maps, conto u rs a nd thre dimen s ion a l figure s  provid es gre a t visibility and  conve n ien c in practi cal a pplication. For   example, wh en it is nece s sary to select a  prope r route for inspe c tion sub s tation or when  cho o si ng the proper p r ote c tive equipm ent nece s sa ry for working  perso nal wit hout turned  of above voltag e, etc.      Table 1. The  Distri bution of  Electric Fi eld  in  the Zone o f  Open Di strib u tion Substati on (Scena rio  1)    The par t of the o pen distribut ion substation territor y ,%,   w h ere th e electric field is  in the range         (E in kV /m)   E Range   0 ≤Е <5 5 ≤Е <10 10 ≤Е <15  15 E<20  20 E<25  25 E<30   T e r r itor y , %,  42.3  21.5  1 1 .3   10.7  7.2      Acco rdi ng to recom m end ations of SanPiN  2.2.4.1 191-03 [8],  employee s, servin g   electri c al in st allation s are  permitted to:   1)  Stay in  the 5 0 -HZ electri c  field with t he  intensity of u p  to 5kV/m d u ring the wo rking   day;  2)  Stay in  the 5 0 -HZ electri c  field with t he  intensity from  5 to  20 kV /  m during limited  time, calcul ated as follo ws:    2 50 E T                                                                       (6)    Whe r e E is th e electri c  field  intensity in kV/m  in the controlled a r e a T  is the time in hrs.   Therefore wh en the electri c  field intensi t y is   in range  from 20 to  25 kV/m, stay of  th e   staf f in this electri c  field sh ould not exce ed 10 minute s 1)  Maximal pe rmitted level o f  the ele c tric  field inten s ity in ope n di stribution  sub s t a tion   is 25 kV/m.   2)  Staying in the  electri c  field  with the inte n s ity of more t han 25 kV/m  without u s e o f  the   prote c tive eq uipment is n o t  permitted.  Going alo ng the cal c ulate d  electri c  field int ensity ,  it is determine d the points wh ere the   electri c  field intensity rea c hes the maxi mum ex posu r e limit values 5, 10, 15, 20kV/m.  T a bl e 1   depi cts, in perce nts, value s  of zone s wi th electr ic fiel d intensitie s less 5kV/m (zone of securit y )   and highe r 5kV/m (zone of  influen ce)  at scena rio 1. Result s of calc ulated data analysi s  in (T a b le  1) are  sho w e d  that, in ave r age; 42.3% of the  open distributio n su bstation s occupy the territory   on whi c h the  electri c  field doe s not exceed 5 k V/ m (zone of se cu ri ty).  A nd the territo ry of open  distrib u tion substatio n s at whi c h the electri c  fiel d is greate r  than 5kV/m, where i t  require s limited  stay time for safety performan ce of work, is  called  the zone of electri c  field influence.  T h is  territory ta ke s, in average, about 57.7%   of the open di stributio n su b s tation.   The dist ributi on of the electri c  field intensity  in the zone of elect r i c  field influen ce where  the electri c  field inten s ity  higher 5 k V/m is as follo ws:  1)  21.5% of the territory falls  on the zo ne  wi th the ele c tric field from  5to 10kV/m,   2)  The  zone  fro m  10 kV to 1 5 kV/m is  mu ch  smalle r (a bout 1 1 .3%  of the territo ry o f   AIS).  3)  The zo ne fro m  15kV to 20 kV/m is abo ut 10.7% of the territory of  AIS.  4)  The pe rcent age of the zone with the  in tensity from 20 to 25kV/m, where  the   permi ssion  stay time is not exceed 1 0  minutes , is a b o u t 7% of the territo ry of  AIS.  5)  The inten s ity of the electric field mo re  than 25kV/m,  where the presen ce with out  person a l prot ective equip m ent is pro h i b it ed, and the value of such  zon e s is the   about 7.2% o f  the territory of  AIS.        Evaluation Warning : The document was created with Spire.PDF for Python.
TELKOM NIKA   ISSN:  2302-4 046     Asse ssm ent of Electric Fi e l d Distri bution  Insi de 50 0/2 20kV O pen Distributio n… (Sayed A. Wa rd)  6477     Figure 5. Map of the Electric Fiel d (V/m ) Di st ributio n insid e  Cai r o 5 00 Substatio n  during  Scena rio 2           Figure 6. Map of the Electric Fiel d (V/m ) Di st ributio n insid e  Cai r o 5 00 Substatio n  during  Scena rio 3       Table 2. The  Maximum and Average El ectri c  Fiel d V a lues for  DIfferent  Working  Conditions  Field calculation   He ight Electric  Field   Scenario   A (Standb y Off )   Scenario B (Stan d b y   On)   1.5 m  Et (Max) (kV/m) i n side all sub    21.98   23.5  Et (Max) (kV/m) i n side 220 kV Sw i t ch y a rd  18.77   22.78   Et (Avg) (kV/m)   7.91  9.99  8.5 m  Et (Max) (kV/m) i n side all sub    103.35   129.99   Et (Max) (kV/m) i n side 500 kV Sw i t ch y a rd  83.71   75.36   Et (Avg) (kV/m)   9.04  13.94   11 m  Et (Max) (kV/m) i n side all sub    123.34   158.55   Et (Max) (kV/m) i n side 220 kV Sw i t ch y a rd  99.09   98.17   Et (Avg) (kV/m)   9.70  14.44   14 m  Et (Max) (kV/m) i n side all sub    127.73   135.69   Et (Avg) (kV/m)   10.97   14.38   17 m  Et (Max) (kV/m) i n side all sub    149.46   152.73   Et (Avg) (kV/m)   10.69   12.55       Figure  5 and  Figure  6 sh o w   the ele c tri c   field  di stribut ion in side  Cai r o 5 00  su bst a tion for   the other two  scena rio s  2 & 3 mentioned  previou s ly, while Table 2  summari ze the  maximum an d   averag e ele c tric field value s  for differe nt workin g co ndi tions.   0 5 0 100 150 200 25 0 3 00 0 50 100 150 200 250 300 350 400 0 500 0 100 00 150 00 200 00 250 00 300 00 350 00 400 00 450 00 500 00 550 00 600 00 650 00 700 00 750 00 800 00 850 00 900 00 950 00 100 00 0 105 00 0 110 00 0 0 5 0 100 15 0 200 250 30 0 0 50 100 150 200 250 300 350 400 -20 000 0 2 0000 4 0000 6 0000 8 0000 1 00000 1 20000 1 40000 1 60000 1 80000 2 00000 2 20000 2 40000 2 60000 2 80000 3 00000 3 20000 3 40000 3 60000 3 80000 4 00000 Evaluation Warning : The document was created with Spire.PDF for Python.
                               ISSN: 23 02-4 046                     TELKOM NI KA  Vol. 12, No. 9, September 20 14:  64 71 – 647 8   6478 From the s e figure s  an d table pre s e n ted  above,  it is found that the  maximum ca lculate d   electri c  field imposed to the human bo dy during  hot -sti ck po sitio n  (scen a rio 1 )  is about 23 .5   kV/m while the maximum  measu r ed e l ectri c  field imposed to the human b ody during this  positio n (sce nario 1 )  is ab out 23kV/m, and the av erage cal c ul ate d  electri c  field imposed to the   human b ody durin g hot-sti ck p o sitio n  (scen a rio 1 )  is  about 10 kV/m while the a v erage m e a s ured   electri c  field imposed to the human bo dy during  thi s  po sition (scen a rio 1 )  is about 9.6kV / m.  Therefore th e simul a tion  results a r e  matche d wi th the mea s ured val u e s  with very small  toleran c (a b out 2.2%)  whi c h i s  be ca use of  the a s su mption ta ken  durin g the  si mulation a nd  due  to the field m e ter u s e d  in  the mea s u r e m ents i s  d e p ende nt on th e natu r al of  place where  the  electri c  field  is mea s u r ed  [9-1 1]. It is also  fou nd that the maximum cal c ul ated ele c tric fi eld  imposed to the human bod y during bare - han d positio n (scena rio 2 )  is about 158 .6kV/m and that  for sce na rio 3 is about 15 2.7kV/m (wit hout con s id er ing the ef fects of insulatin g  clothe s) wh ich  are con s iste n t  with other re lated study [1 2].  Following  the electric field during live line ma intenance, the electric field intensity is  higher , exceeds, the exposure limit.  So the work ers should not  last for more than  several  minutes in live line maintenance position.      4. Conclu sion   In this study, a method is  prop osed for  determi ning t he distri butio n of the elect r ic field   prod uced in si de hig h -volta ge op en di stri bution  sub s ta tions. Thi s  m e thod i s  ba se d on the  charge   simulatio n  techniqu e. And the most imp o r tant  res u lts  from this  s t udy are as  follows 1)  It is found  that the el ect r ic fiel d cha nge s from  p o int to poi nt insid e   sub s t a tion  swit chyard. Accordi ng to this inve stigati on re sult s, a map of ele c tric field inten s ity  distrib u tion was buil d  for this sub s tatio n . This map  depi cts lo cati on of are a with  different level  electri c  field  intensity. Thi s  map i s  u s e d  for pla nnin g  and  con d u c ting  works insi de  sub s tation s a nd for moving  inside  sub s ta tion for equip m ent insp ecti on.  2)  This investig ation sho w e d  that, in av erage, about 4 2 .3% of the  open di stribu tion   sub s tation s o c cupy the territory on whi c h t he electri c   field doe s not  exceed 5  kV /  (zo ne of  se cu rity), and the  maximum ele c tri c  fi eld inte nsity at this substatio n  is l e ss  than 2 5 kV/m  and  only  at  ce rtain  poi n t s in  some  open  di stribu tion sub s tations  rea c he s aval ue gre a ter th an 25 kV/m.  3)  The value of  electri c  field during live  line mainten a n ce is hi ghe r, exceed s, the  exposure limi t. So the workers  sho u ld n o t la st for mo re than  several minute s  in live  lin e  ma in te nan c e  po s i tion     Referen ces   [1]  L Ortiz, J Zoletti,  F  Saave d r a, A Gonz ale s ELF  F i eld   Emiss i ons  fro m  E l ectric P o w e r Systems.   Procee din g s of  the EMC 94, Roma, Ital y . 1 9 94; 426- 43 0.  [2]  WHO - World Health Or ga n i zatio n . Extrem el y l o w  fre que nc y fiel ds. En vironme n tal  H ealth  Criteri a .   W o rld He alth  Organiz a tion,  Geneva. 2 007;  238.   [3]  EMF  Design  Guide lin es for Electric facil i tie s . Report, Sou t hern Ca lifor ni a Ediso n  Com pan y (SCE ) ,   200 4.  [4]  IEEE Std. Safet y   Lev els Wit h  Res pect to  Human  E x pos u re to E l ectromagnetic Fields, 0 to 3 k H z,   IEEE Std. C95. 6-2002. 2002.   [5]  NH Ma lik. A  R e vie w   of t he  C harg e  Sim u l a ti on M e tho d  a n d  Its Appl icati o n s .  IEEE Trans. On Electrical  Insulation . 19 8 9 ; 24(1): 3-20.   [6]  E kuffel, W S   Z aeng le, J K u ffel. Hig h vo lta ge  eng in eeri n g ,  fundam entals .  Ne w n es, Se cond  ed itio n   reprint, 20 01 ( T ext book).  [7]  Masan o ri Akaz aki, Ki yoto Mis h ijim a. Calc ula t ion of  three d i mensi ona l a x is ymmetric fie l ds  b y  ch arg e   simulati on met hod. Electric al  Engi neer in g in  Japa n. 197 8; 98(4): 1–7.   [8]  SanPi N  2.2.4.1 191- 03 El ectro m agn etic  fields  in the  w o rki ng  envir onme n t. 2008.   [9]  HI 3604 ELF  S u rve y  M e ter Us er’s Man ual, H o lla da y In d. 20 02.   [10]  HI-441 3 F i ber  Optic RS-232 I n terface  W i th Probe Vi e w ™  360 0 User’s m anu al. 20 02.   [11]  IS Okrainskaya, SP Glady s hev,  AI Sidorov , NV Glotova. Investigat i on o f  Electric F i eld  Distributi o n   Inside 500 kV Po w e r Distribution S ubstations. IEEE  International Co nfer ence on Electr o Information  T e chnolog y (EI T ), Rapid Cit y ,   South Dak o ta, USA. 2013: 1- 4.  [12]  W  Kraje w ski.  Numeric a l ass e ssment of e l ectr omag netic  expos ure d u ri ng liv e-li ne  works on h i g h - voltag e ob jects .  Science Mea s ureme n T e chno log y  IET .   200 9; 3(1): 27- 38.   Evaluation Warning : The document was created with Spire.PDF for Python.